Free Migration - Zero Downtime

Bring everything.
Leave nothing behind.

Hosting, domains, email, DNS, CDN, and security - moved by one team, tested before cutover, and backed by a 72-hour rollback window. You keep working; we handle the switch.

Free Migration Zero Downtime 24-Hour Turnaround 14-Day Money Back
Transfer manifest
6 services · one team
Included
Hosting
Files, databases, apps
Domains
Registration and DNS
Email
Mailboxes, aliases, filters
DNS
Records, TTL, DNSSEC
CDN
Cache rules and SSL
Security
WAF, malware, hardening
One plan. One point of contact. Free
₹0
Migration Fee
Hosting, email, DNS, and domain moves included.
0 min
Downtime
Low-TTL cutover with the old host kept warm.
24h
Typical Turnaround
Most standard sites, stores, and mailboxes.
72h
Rollback Window
If anything is off, we switch back while we fix it.
Free Migration
No setup or transfer fee
Zero Downtime
Planned low-TTL cutover
Named Engineer
One person owns your move
24/7 Support
Before, during, and after
What Moves

Everything you run today. Moved properly.

Migration is not a file copy. Each service has its own cutover, checks, and rollback plan - because a broken MX record can be worse than a broken homepage.

Hosting

01
Files · databases · applications

Your files, MySQL databases, cron jobs, and application configuration move to NVMe SSD on LiteSpeed. We run the site on a staging URL before DNS changes.

Files MySQL Cron
Explore hosting

Domains

02
Registration · WHOIS · renewal

Transfer the registration or simply point the nameservers. WHOIS privacy, auto-renewal, and registry locks are configured during the move.

Registrar Privacy Auto-renew
Transfer a domain

Email

03
Mailboxes · aliases · filters

Mailboxes, aliases, forwarders, and filters are recreated on your domain. We sync existing mail so nothing disappears from a client or inbox.

IMAP sync Aliases DKIM
Explore email

DNS

04
Records · TTL · DNSSEC

Every A, AAAA, CNAME, MX, TXT, SRV, and CAA record is replicated, then served from 200+ anycast PoPs with DNSSEC enabled.

Anycast DNSSEC TTL
Explore DNS

CDN

05
Cache rules · SSL · edge delivery

Cache rules, image optimisation, and SSL are reconfigured at the edge. Your origin IP is masked from the first request onward.

Caching SSL WAF-ready
Explore CDN

Security

06
WAF · malware · hardening

WAF rules, malware scans, and login hardening are applied before cutover, so the new site is safer on day one - not after an incident.

WAF Malware 2FA
Explore security
The Switch

Six services in. One account out.

You do not need to move everything at once. Start with hosting, keep DNS where it is, and move mail later - the plan is yours.

Where you are today

The current stack

Current hosting
Files, databases, control panel
Current
Domain registrar
Registration and WHOIS
Current
Email provider
Mailboxes and aliases
Current
DNS provider
Records and nameservers
Current
CDN or proxy
Edge rules and SSL
Current
Security stack
WAF, scans, hardening
Current
Where you land

One Luveedu Cloud account

Hosting on LiteSpeed + NVMe
Domains with free WHOIS privacy
Business email on your domain
Anycast DNS with DNSSEC
Global CDN with free SSL
Ultra Security included
One dashboard. One invoice.
Zero downtime

Low TTL before cutover and the old host kept warm until DNS settles.

No data loss

Files, databases, and mail are copied and checked before anything switches.

No migration fee

Included with your plan, including email and DNS moves.

72-hour rollback

If something is off, we can switch back while we fix it.

How It Works

A migration plan, not a wing and a prayer.

Four stages, one owner, and a checklist that is signed off before DNS moves.

01
Day 0

Audit

We map your host, DNS, mail, and application stack, then send a written plan with risks and a proposed cutover window.

02
Day 0-1

Stage

Files, databases, and mailboxes are copied to Luveedu Cloud. Your site runs on a staging URL while we test it end to end.

03
Day 1

Verify

Forms, checkout, redirects, SSL, and email delivery are checked against a migration checklist before anything goes live.

04
Day 1

Cutover

DNS switches at a low TTL. The old host stays warm for 72 hours, so a rollback is a decision - not a disaster.

Typical turnaround
24 hours
For standard sites, stores, and mailboxes.
Downtime
Zero
DNS cutover at low TTL with the old host warm.
Rollback window
72 hours
We can switch back while the issue is fixed.
The Difference

What most hosts leave out.

The transfer itself is only half the job. The other half is what happens when something does not go to plan.

What changes
Typical host
Luveedu Cloud
Migration fee
₹2,500 - ₹10,000
Free
Downtime during move
2-24 hours
Zero
Support during migration
Shared ticket queue
Named migration engineer
Web stack
Apache + HDD
LiteSpeed + NVMe SSD
Security
Paid add-on
WAF, malware scan, hardening included
Rollback
Not offered
72-hour window
Setup & renewal fees
Common
None, transparent pricing
Where You Land

Pick a plan. The move is on us.

Migration is included on every hosting plan. Choose the stack that fits the site you are bringing over.

Migration Included
Shared Hosting
Moving off basic shared hosting
from ₹79 /mo
  • LiteSpeed + NVMe SSD
  • cPanel and 1-click WordPress
  • Free SSL and daily backups
  • Free migration on every plan
View Shared Plans
Migration Included
Cloud Hosting
High-traffic sites and scaling stores
from ₹349 /mo
  • Dedicated vCPU and NVMe storage
  • Auto-scaling on traffic spikes
  • 99.99% uptime target*
  • Free migration and priority support
View Cloud Plans

Only moving a domain? The domain transfer service includes free DNS, WHOIS privacy, and a year of hosting.

Reviews

2,000+ switches. Zero regrets.

Real feedback from customers who moved hosting, mail, domains, and DNS to Luveedu Cloud.

4.9
out of 5.0
AR
SM
RK
PL
VS
+9K
10,000+ verified reviews
Rating Breakdown
5
92%
4
6%
3
1.5%
2
0.3%
1
0.2%
Why Customers Trust Us
2,000+
Migrations completed
24h
Typical turnaround
72h
Rollback window
AR
Arjun R.
Mar 2026

“Moved 18 client sites from Bluehost over a weekend. Every site was staged and tested before DNS changed - not a single minute of downtime.”

Hosting
SM
Sneha M.
Feb 2026

“Forty mailboxes, aliases, and filters moved without losing a single message. The team synced old mail too, which no previous host offered.”

Email
RK
Rahul K.
Jan 2026

“Transferred the domain and all DNS records in one go. MX, SPF, DKIM, and even a forgotten SRV record came across correctly.”

DNS
PL
Priya L.
Dec 2025

“Our WooCommerce store was tested end to end on staging - checkout, emails, coupons - before cutover. That level of care is rare.”

Ecommerce
AS
Aditya S.
Nov 2025

“The low-TTL plan meant the switch happened without anyone noticing. The old host stayed warm for three days just in case.”

Zero Downtime
VT
Vikram T.
Mar 2026

“The migration engineer was named from day one. I had one person to ask, not a rotating ticket queue.”

Support
NJ
Neha J.
Feb 2026

“We moved DNS first, then mail a week later. No pressure to do everything at once, and no downtime either time.”

Phased Move
AK
Ankur K.
Jan 2026

“SSL was reissued and HTTPS enforced before the switch. No mixed-content warnings, no browser interstitials.”

SSL
RG
Ritu G.
Dec 2025

“They cleaned malware on the old site during migration, then hardened the new one. We went live safer than we left.”

Security
DM
Deepak M.
Nov 2025

“Moved from a host that charged for migration and still broke our forms. Luveedu Cloud did it free and tested every form.”

Value
FAQ

Questions about switching.

What moves, what it costs, and what happens if something goes wrong.

Still have questions? Our security team is available 24/7.

Contact Support